Electric Co-op Boundary
A boundary and vendor-access packet for a rural electric cooperative.
The problem
Control systems and office IT often share a path. Integrator logins stay open. The board or pool asks for proof.
What you receive
- Scorecard
- Reachability note
- Vendor remote list
- Short fix order
How we work
No SCADA logins. No member billing data. Calls plus files the co-op already holds.
After the packet
The manager attaches the scorecard for the pool or the board. Staff work the fix order. Benefit: a dated review without a full CIP project.
What others lose without this
Co-ops with flat networks and standing integrator access carry the same outage risk as other small OT shops. The packet makes that gap visible before an insurer or an incident does.